We visited Albert this morning to check that she was OK (she was). The marina extension, that I reported on earlier, has progressed well with the new area not just flattened but now excavated. Most of the sheet piling is now in place and the field by the entrance now has a large spoil heap. With all the wet weather, as you can imagine, the site is quite muddy.
The extension is being carried out by GJP Marinas who have been quite busy locally and further afield.
Marina extension