Blacking at Baxters Boatyard

Docking

On Monday we took Albert into the dry dock at Yardley Wharf. Baxters Boatyard are blacking Albert's hull with epoxy, but we are also having some other jobs done.

We had Albert's hull grit blasted and coated with epoxy-based bitumen at Debdale back in August 2013, The coating appears to have lasted well but we decided that coming up to 5 years it was time to recoat it. The anodes that were renewed in 2013 have still plenty of life left.

One of the other jobs is a repair on the forward chimney collar. A hard wood fillet was used to make the chimney vertical. The wood has, after 23 years, finally failed and become cracked. We had a few small water leaks over the last year that I filled with silicone sealant. A metal fillet plate is being made and fitted which should be a better solution..

We are also starting a partial refurbishment of the bathroom. The tiles have lost their surface and need replacement and various other items also need attention. A new shower tray, hand basin and shower valve are being fitted along with some new tiles. More on this later.

0 comments: